Services

Powerlines Plus focus on projects in regional and remote areas of WA.

This includes:
• Kimberley
• Pilbara
• Midwest
• Wheatbelt
• Southwest

The team has experience across projects in regional and remote WA, but also work in metropolitan areas in all parts of Australia.

Key Capabilities

• Major shutdown for distribution lines
• Electrical Installation Works
• Power line construction distribution
• Tower line Construction (transmission)
• Sub-Station Construction
• Major shutdown and tie ins for the mining sector and utility networks
• Maintenance on all electrical systems including power lines, tower lines and substations
• Transformer installations
• Transformer upgrades
• Power station upgrades and installations
• Demolitions of electrical infrastructure and apparatus’
(Powerlines Plus carry a demolition license WAD 295)
• Pole reinforcing and strengthening
• Street light installation and maintenance
• Construction of underground networks
• Directional drilling
• HV and LV cable jointing
• Live line and substation washing
• Earth protection studies for lighting and earthling systems
• Deep earth drilling
• OPGW installation and maintenance
• Construction of underground fibre networks

Transmission Lines

• Major shutdowns for transmission
• Construction of transmission lines from 66kV to 220kV
• Maintenance of transmission lines
• Tower Construction
• Civil and Concrete footings